YEAR 2016

Steel structure fabrication and installation for a project „Shopping Center Havířov Na Kopci“ for a company  NBS Invest a.s.
Fabrication: 30 tonnes
Installation: 73 tonnes

Production of  254 pieces of columns with side fits for noise barriers.
Weight: 85 tonnes

Steel structure installation for a project „Automatic Parking System, ČVUT – Czech Institute of Informatics, Robotics and Cybernetics -CIIRC“.
Weight: 89 tonnes

Production of steel bolts for a project „Stadium San Mames, Bilbao“ incl.surface treatment.
Weight: 42 tonnes

Disassembly, production and installation of steel structure incl. surface treatment for a project  „CONVEYOR BELT 020 REPAIR IN AGGLOMERATION“ in the area of a company ArcelorMittal Ostrava a.s.
Weight: 120 tonnes

Disassembly, production and installation of steel structure for a project „Repair of the 1st and 2nd field of the bridge of conveyor belts P70 and P71 from the north in the area of a company ArcelorMittal Ostrava a.s.“ inlc. surface treatmet.
Weight: 55 tonnes

Steel structure delivery and installation of objects SO 503 and SO 504 for a project „Universal granulation line and ammonium nitrate“ in the area of a company LOVOCHEMIE a.s. – Lovosice inlc. surface treatment.
Weight: 137 tonnes

Fabrication of supporting steel structure for a project „Storage shed Autoneum CZ – Choceň“ incl. surface treatment.
Weight: 99 tonnes

Steel structure delivery of a taxiway for a project „Ore Crane Repair – AMO“ incl. surface treatment.
Weight: 136 tonnes

Steel structure delivery and installation for a project „Ventilation in a hall ALU 1“ and „Reinforcement of the roof of the northern outbuilding ALU2“ in the area of a company MAXION WHEELS, Ostrava-Kunčice incl.surface treatment.
Weight: 77 tonnes

Steel structure production of bridges, pylons and towers for a project „Equipment for cleaning“ incl. surface treatment.
Weight: 62 tonnes