YEAR 2022

Delivery of a supportive steel structure for a project „Hall – Belohošť“ including surface treatment.
Weight: 65 tonnes

Production of technological steel structure for a project „Ofenstütze“ including surface treatment.
Weight: 61 tonnes

Production of bridge and tower steel structure for a project „Mischerturm Mühle“ including surface treatment.
Weight: 19 tonnes

Delivery of a supportive steel structure for a project „Administrative Extension – Belohošť“ including surface treatment.
Weight: 27 tonnes

Delivery of a steel structure for a project „TAWESCO – PRESS SHC 2000“ including surface treatment.
Weight: 46 tonnes

Delivery and assemby of steel structure for a project „ZEVO MALEŠICE – Repair of the Flue Gas Cleaning Building “ including surface treatment.
Weight: 37 tonnes

Delivery of a steel structure for a superstructure of air-conditioning for a project „WIESBADEN“ including surface treatment.
Weight: 25 tonnes

Disassembly, production and assembly of a steel structure for 4 pieces of fields for a project “ Repair of Bridge Structure of Conveyor Belts P70 a P71″  on the premises of the company Liberty Ostrava a.s. including surface treatment.
Weight: 116 tonnes

Delivery of platform and footbridge steel structure for a project „NEXEN TIRE“ including surface treatment.
Weight: 85 tonnes

Delivery and assembly of crane runway steel structure for a project „Hall Reconstruction  Ostrava-Kunčice“ including surface treatment.
Weight: 88 tonnes