{"id":5212,"date":"2016-03-02T13:06:55","date_gmt":"2016-03-02T13:06:55","guid":{"rendered":"https:\/\/www.mmo-sro.cz\/?page_id=5212"},"modified":"2016-03-18T12:07:27","modified_gmt":"2016-03-18T12:07:27","slug":"year-1995-2010","status":"publish","type":"page","link":"https:\/\/www.mmo-sro.cz\/en\/reference\/year-1995-2010\/","title":{"rendered":"YEAR 1995-2010"},"content":{"rendered":"<h3>(RANGE 50 TONS \u2013 100 TONS)<\/h3>\n<p>Delivery of hall steel structure for a project Bv. Trespaphan in\u00a0Neurkirchen of <strong>weight 90 tons<\/strong><\/p>\n<p>Delivery of steel structure of Bakery Brinker in\u00a0Herne of <strong>weight 60 tons<\/strong><\/p>\n<p>Delivery and installation of hall steel structure for a project \u201eModernizing production in\u00a0Olma a.s., plat Z\u00e1b\u0159eh na Morav\u011b\u201c \u00a0of <strong>weight 61 tons<\/strong><\/p>\n<p>Production and installation of steel structure warehouse for a company DENAS COLOR a.s. incl. warehouse cladding, steel structure and doors of total <strong>weight 51 tons<\/strong><\/p>\n<p>Installation of steel structure in Power station Tu\u0161imice of weight<strong> 65,8 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of Winter stadium in \u010cesk\u00e1 T\u0159ebov\u00e1 of weight 92 tons<\/p>\n<p>Delivery of steel structure for a project \u201eDesulphurization of crude iron\u201c in\u00a0T\u0159ineck\u00e9 \u017delez\u00e1rny a.s. T\u0159inec of weight <strong>87,8 tons<\/strong><\/p>\n<p>Delivery and installation of cooling tunnel in the Plant Jiho\u010desk\u00e1 dr\u016fbe\u017e, plant Vod\u0148any of <strong>weight 94\u00a0tons<\/strong><\/p>\n<p>Delivery and installation of pipeline relocations for Coking plant Jan \u0160verma of <strong>weight 78 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of platform shelter for a railway station \u2013 Prague Main station of <strong>weight 51,1 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a plant Rolling mill Fr\u00fddek \u2013 M\u00edstek of <strong>weight 65,6 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of Radar tower Praha \u2013 Ruzyn\u011b of <strong>weight 56 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of the tray aggregate for the Concrete plant T\u0159inec of <strong>weight 64,2 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of the tray aggregare for CS Beton in\u00a0Litom\u011b\u0159ice of <strong>weight 56,3 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure and tray aggregate for the Concrete plant Mohelnice of\u00a0 <strong>weight 53 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure and tray aggregate for the Concrete plant Praha \u2013 Male\u0161ice of <strong>weight 64,2 tons<\/strong><\/p>\n<p>Delivery and installation of tray aggregate for a precast concrete IP PREFA Olomouc of <strong>weight 88,7 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of the noise measures in the Quarry SKANSKA a.s., plant Klecany of <strong>weight 85,5 tons<\/strong>\u00a0<\/p>\n<p>Delivery and installation of steel structure and tray aggregate for the Concrete plant Prefa Su\u010dany \u2013 Slovakia of <strong>weight 96,3 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure and tray aggregate for the Concrete plant in\u00a0Ostrava \u2013 P\u0159\u00edvoz of <strong>weight 98,1 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for the Concrete plant Kutno, Poland of <strong>weight 87 tons<\/strong><\/p>\n<p>Delivery of steel structure for the Concrete plant in Ukraine of <strong>weight 52,9 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure and tray aggregate for the Concrete plant Nov\u00e9 Hrady of <strong>weight 66,3 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure and tray aggregate for the Concrete plant SKANSKA \u0160t\u011bt\u00ed of <strong>weight 78,6 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of hall coolant tunnel of <strong>weight approx. 89 tons<\/strong><\/p>\n<p>Steel structure assembly of roofing by the station building at the station in Svitavy of <strong>weight 7 t<\/strong> and installation of steel structure of perrone shelter of <strong>weight 98 tons<\/strong> \u00a0\u00a0<\/p>\n<p>Installation of steel structure for a project \u010cD DDC, optimization of the railway junction in Bohum\u00edn of <strong>weight 71 tons<\/strong><\/p>\n<p>Supply of supporting steel structure of <strong>weight \u00a059 tons<\/strong> for the Heating plant Kyjov.\u00a0<\/p>\n<p>Disassembly, delivery and installation of steel structure and technology for reconstruction of the dryer of <strong>weight 60 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of annexe hall SO 30 \u2013 raw materials sector for a company ROCKWOOL a.s. of <strong>weight 55,7 tons<\/strong><\/p>\n<p>Delivery and installation of roof steel structure for a building of a company BKB Metal, a.s. of <strong>weight 56,6 tons<\/strong><\/p>\n<p>Installation of steel structure for delicatessen manufactory in D\u011b\u010d\u00edn of <strong>weight 84 tons<\/strong><\/p>\n<p>Delivery and installation of sport hall for the elementary school in\u00a0P\u0159ibyslav of <strong>weight 86 tons<\/strong><\/p>\n<p>Delivery and installation of roofing steel structure for Central court of tennis center Morava of <strong>weight 58 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for reconstruction of Bakery in Prost\u011bjov of <strong>weight 63tons<\/strong><\/p>\n<p>Delivery and installation of roof steel structure for an annex of Theatre of A. Dvo\u0159\u00e1k in Ostrava of <strong>weight 62 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for reconstruction of Fire station Ostrava \u2013 Fifejdy of <strong>weight 63 tons<\/strong><\/p>\n<p>Delivery and installation of roof extension of \u00a0\u201eobject F\u201c Regional office Moravskoslezsk\u00fd kraj in \u00a0Ostrava of <strong>weight 77 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for repair of Mansion \u00a0V\u00cdTKOVICE of <strong>weight 73,2 tons<\/strong><\/p>\n<p>Delivery of steel structure of Universal Tower for amusement park in Orlando, USA of <strong>weight 96,4 tons<\/strong><\/p>\n<p>Fabrication of steel structure for turbofiltr in\u00a0Essen \u2013 Germany of<strong> weight 69,2 tons<\/strong><\/p>\n<p>Delivery of steel structure of <strong>weight 75,6 tons<\/strong><\/p>\n<p>Installation of steel structure of the bridge over Ostravice and footbridge over the stream \u0160\u010du\u010d\u00ed in\u00a0Ostrava \u2013 Hrabov\u00e1 of <strong>weight 62,7 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of footbridge over street B\u011blot\u00ednsk\u00e1 in Hranice na Morav\u011b, delivery of <strong>weight 28,3 tons<\/strong> and installation of <strong>weight 49,3 tons<\/strong><\/p>\n<p>Installation of steel structure of Coal services for a company Coking plant Svoboda in Ostrava \u2013 P\u0159\u00edvoz of <strong>weight 55 tons<\/strong><\/p>\n<p>Fabricaton of \u00a0<strong>91 tons<\/strong> of steel structure and installation of <strong>544 tons<\/strong> of steel structure of hall \u00a0SO 02 \u2013 Galvanizing plant BEKAERT \u2013 wires production<\/p>\n<h3>(RANGE OVER 100 TONS)<\/h3>\n<p>Installation of\u00a0 steel structure of a hall &#8222;GEMI&#8220; and shelves of <strong>weight 450 tons<\/strong><\/p>\n<p>Installation of steel structure of a production hall and a store seeds for a company SEME s.r.o. Mikulov in\u00a0Mu\u0161lov,<strong> weight 127 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of operational facilities \u201eF1\u201c, \u201eF2\u201c, \u201eE\u201c and \u201eJ\u201c for a project \u201eService centre JMP a.s. Brno\u201c of <strong>weight 1\u00a0952 tons<\/strong><\/p>\n<p>Delivery of steel structure of a casting platform for a building Casting house \u2013 Blast furnace no. 4 for VPO a.s. in\u00a0Ostrava \u2013 Kun\u010dice of <strong>weight 268 tons<\/strong><\/p>\n<p>Delivery and installation of gutters for North and South Casting house \u2013 Blast furnace no. 3 in \u00a0ArcelorMittal Ostrava a.s. of <strong>weight 169,5 tons<\/strong><\/p>\n<p>Production of dedicated tools of <strong>weight 119 tons<\/strong> and delivery of dedicated installation tools of <strong>weight 140 tons<\/strong><\/p>\n<p>Delivery of steel structure of dedicated tools for bridges assembly of <strong>weight 105,5 tons<\/strong><\/p>\n<p>Delivery of steel structure for the bridge T\u0159ebu\u0161ice of <strong>weight 152,7 tons<\/strong><\/p>\n<p>Production of steel structure of ladders and handrails for a company Gebr.Meiser GmbH of <strong>weight 104\u00a0tons<\/strong><\/p>\n<p>Installation of steel structure of building silos for the Heating plant Olomouc of <strong>weight 198 tons<\/strong><\/p>\n<p>Installation of steel structure for a project \u201eDesulphurisation in Coking plant for a company Nov\u00e1 Hu\u0165 a. s.\u201c of <strong>weight approx. 500 tons<\/strong><\/p>\n<p>Installation of platform steel structure \u201eDedusting of Tandem furnace no. For NH a. s.\u201c of <strong>weight 115\u00a0tons<\/strong><\/p>\n<p>Installation of steel structure of the absorber tower and other objects on site of desulphurization unit in V\u0159esov\u00e1 of <strong>weight 1062 tons<\/strong><\/p>\n<p>Delivery of steel structure of the granulating tray in T\u0159inec of <strong>weight 150 tons<\/strong><\/p>\n<p>Delivery of steel structure for a project \u201eService center V \u2013 KUTY\u201c in\u00a0Pet\u0159vald of <strong>weight 218,3\u00a0tons<\/strong><\/p>\n<p>General repair of Blast furnace no.3 for ArcelorMittal Ostrava a.s. &#8211; \u00a0disassembly of steel structure of <strong>weight 332 tons<\/strong>, installation of steel structure of <strong>weight 770 tons<\/strong> incl. technological equipment assembly of w<strong>eight \u00a0252 tons<\/strong><\/p>\n<p>Delivery of technological parts for a project &#8220; Desulphurisation of coke oven gas for the Coking plant\u00a0 Svoboda in\u00a0Ostrava P\u0159\u00edvoz&#8220; \u00a0of <strong>weight 513 tons<\/strong> <em>(total worht 33 063\u00a0000 CZK)<\/em><\/p>\n<p>Delivery and installation of steel structure of the hall and sheating by SUNIP pannels for \u201eShipping and storage hall for a company\u00a0J\u00c4KL Karvin\u00e1 a. s.\u201c of <strong>weight 130 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of hall M6 annex and extension for engine room VZT for a company \u00a0\u0160koda Auto a. s.\u00a0 Mlad\u00e1 Boleslav, of <strong>weight 246 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of SO 5-86 Coke mill in the Coking plant Svoboda in\u00a0Ostrava-P\u0159\u00edvoz of <strong>weight 244 tons<\/strong><\/p>\n<p>Delivery and installation of hall steel structure for a project \u201eWarehouse steel strip PDL II \u2013 SOO1\u201c\u00a0 in\u00a0J\u00c4KL Karvin\u00e1 a. s. of <strong>weight 377 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eSlag mill\u201c for a company RUGBY CZ D\u011btmarovice of weight 141 tons incl. disassembly of the existing steel structure of <strong>weight \u00a0127 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure incl. hall sheathing for a new plant BLANCO CZ in\u00a0Chlebovice of <strong>weight 160 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of hangar in the Coking plant Svoboda of <strong>weight 260 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of the temporary hangar incl. sheathing by trapezodial sheets for a project \u201eModernization of coke battery no. 10 in Koksovna Svoboda\u201c in\u00a0Ostrava \u2013 P\u0159\u00edvoz of\u00a0 <strong>weight 260 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of warehouse extension for a company\u00a0Olma a.s. Olomouc of <strong>weight 106 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of crane runways in a tubular hall and in a strips warehouse in J\u00c4KL Karvin\u00e1 a. s. of\u00a0<strong>weight 161 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of crane runways in the drawing hall of a company J\u00c4KL Karvin\u00e1 a. s. of <strong>weight 109 tons<\/strong><\/p>\n<p>Installation of protective cover steel structure for a Coke battery no.1 for Mittal Steel a.s. Ostrava of <strong>weight 130 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for I., II. a III. Phase of soundproofing of the electric arc furnace no. 5 for a company V\u00edtkovice a.s. of <strong>weight 200 tons<\/strong><\/p>\n<p>Delivery and installation of beam steel structure for the Pan surface in \u00a0NOV\u00c1 HU\u0164 a. s.\u00a0 Ostrava of <strong>weight 225 tons<\/strong><\/p>\n<p>Delivery and installation of the Winter stadium roofing in Bohum\u00edn of <strong>weight 102 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of the tray of size \u00a0910 m<sup>3<\/sup> for treatment and storage of aggregates and cement in Prague of <strong>weight 106 tons<\/strong><\/p>\n<p><strong>Delivery and installation of steel structure and tray aggregates<\/strong><\/p>\n<ul>\n<li>in\u00a0\u017dilina of weight 108,2 tons<\/li>\n<li>in Croatia, Austria and Poland of total weight 110 tons<\/li>\n<li>in Prague \u2013 Horom\u011b\u0159ice of weight 191,5 tons<\/li>\n<li>in Olbramovice of weight 101,4 tons<\/li>\n<li>Goldbeck Prefabeton s.r.o. plant Vrdy of weight 277,5 tons<\/li>\n<li>TBG Metrostav, Praha-Troja, of weight 166 tons<\/li>\n<li>Tova\u010dov of \u00a0weight 127 tons<\/li>\n<li>Praha \u2013 Uh\u0159\u00edn\u011bves of weight 127,8 tons<\/li>\n<li>Velk\u00e9 \u017dernoseky of weight 104,3 tons<\/li>\n<li>PRESBETON Bystrovany of weight 123,8 tons<\/li>\n<li>\u017d\u010f\u00e1r nad S\u00e1zavou of weight 101 tons<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>Installation of steel structure of building facility SO \u2013 rolling mill plant, outdoor crane runway and pan furnace hall for Miniinihu\u0165 in NOV\u00c1 HU\u0164 a.s.\u00a0 Ostrava <em>(Weight of assembled steel structure was <strong>approx. 1 000 tons<\/strong>)<\/em><\/p>\n<p>Installation of steel structure for a contruction Hyundai of <strong>weight approx. 1 350 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of the Portioning meat hall in the plant Mod\u0159ice of <strong>weight 151 tons<\/strong><\/p>\n<p>Installation of steel structure of portala for tolls of <strong>weight 263,7 tons<\/strong><\/p>\n<p>Installation of steel structure for the Servis station Praha \u2013 Jarov of <strong>weight 120,2 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of part pipeline bridge for rerourting pipeline in the plant V\u00cdTKOVICE a.s<em>. (delivery<strong> 149,7 tons<\/strong> and installation \u00a0<strong>196,5 tons<\/strong>)<\/em><\/p>\n<p>Reconstruction of\u00a0 the Production base MERKO CZ, a.s. of <strong>weight 175 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of hall, pipeline bridges and columns, platforms and energy bridges in operation unit<em> Compressor hall, C<\/em><em>oke oven gas<\/em> <em>desulphurisation<\/em> <em>and modified sulfured production<\/em> in the plant Jan \u0160verma in\u00a0Ostrava-Mari\u00e1nsk\u00e9 Hory for a project \u201eCoke oven gas desulphurisation\u201c of <strong>weight 466 tons<\/strong><\/p>\n<p>Installation of pipelines and technological equipments of <strong>weight 390 tons<\/strong> and delivery and installation of steel structure of <strong>weight 120 tons<\/strong> for a project mentioned above \u201eCoke oven gas desulphurisation\u201c<\/p>\n<p>Delivery and installation of steel structure of hall objects for a project \u201cProduction plant IWK \u2013 Kysuck\u00e9 Nov\u00e9 Mesto\u201c of <strong>weight 225 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of social service part \u201eCELESTICA R\u00e1je\u010dko \u2013 a new plant\u201c in\u00a0R\u00e1je\u010dko of <strong>weight 166 tons<\/strong><\/p>\n<p>Installation of steel structure of the object OLYMPIA\u00a0 in Mlad\u00e1 Boleslavi of weight 118 tons<\/p>\n<p>Delivery and installation of a hall for debarking in a company Assi Doman a. s.\u00a0 \u2013 Sepap \u0160t\u011bt\u00ed of <strong>weight 119 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project TG6 for a company Mondi a.s. \u0160t\u011bt\u00ed of <strong>weight \u00a0165,5 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eReconstruction PS 3\u201c in the plant FRENTSCHACH PULP &amp; PAPER Czech, a. s. \u0160t\u011bt\u00ed of <strong>weight 178 tons<\/strong><\/p>\n<p>Delivery and installation of traffic bridge of weight 75 tons and steel structure of roof hall of new central warehouse of\u00a0 a company ROOCKWOOL a.s. \u2013 finished products of <strong>weight 190 tons \u00a0<\/strong><\/p>\n<p>Delivery and installation of steel structure incl. disassembly while realization of a new production line and cupola furnace for a company ROCKWOOL a.s. of <strong>weight 115 tons<\/strong><\/p>\n<p>Delivery and installation of the hall extension of line BOH2 \u2013 SO 23 for a company ROCKWOOL a.s. of <strong>weight 139 tons<\/strong><\/p>\n<p>Production of trusses steel structure for Hyundai No\u0161ovice of weight 352 tons<br \/><em>(We also fabricated steel structure of pipe bridge for this project)<\/em><\/p>\n<p>Delivery of steel structure for a project GEPROMO of <strong>weight 115,5 tons<\/strong><\/p>\n<p>Delivery and installation of a gym steel structure for the Elementary school ul. Pion\u00fdr\u016f in Fr\u00fddek \u2013 M\u00edstek of <strong>weight 113\u00a0tons<\/strong><\/p>\n<p>Delivery of steel structure for the discharge conveyor to towers A and D in the Coal dump Ji\u0159\u00ed in\u00a0Lipnice of <strong>weight 197 tons<\/strong><\/p>\n<p>Installation of steel structure of a storage hall in the plant Mattoni in\u00a0Kyselce of <strong>weight 474 tons<\/strong><\/p>\n<p>Fabrication and installation of girders steel structure of <strong>weight 112 tons<\/strong> for a construction of a bridge at the border crossing Rozvadov<\/p>\n<p>Installation of steel structure for a project \u201eRelocation of the loading of coal in the Coal dump \u00a0Ji\u0159\u00ed in\u00a0Lipnici of <strong>weight 570 tons<\/strong><\/p>\n<p>Delivery and installation of annex steel structure of the Palace of Culture and Sport in Ostrava \u2013 V\u00edtkovice of <strong>weight 264 tons<\/strong><\/p>\n<p>Installation of steel structure for a project \u201eGO and modernization of steelworks 1-ISSM V\u00cdTKOVICE STEEL a.s.\u201c of <strong>weight 456,8 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of the production hall Marlenka in Fr\u00fddek \u2013 M\u00edstek of <strong>weight 166 tons<\/strong><\/p>\n<p>Delivery of steel structure of an absorber tower of <strong>weight 344 tons<\/strong> for \u00a0the desulphurization unit V\u0159esov\u00e1<\/p>\n<p>Production and delivery of roof steel structure for SP\u0160S in\u00a0Havl\u00ed\u010dkov\u016fv Brod of <strong>weight 104 tons<\/strong><\/p>\n<p>Disassembly of steel structrure of archive shelves in the Hospital Ostrava \u2013 Fifejdy of <strong>weight 107 tons<\/strong><\/p>\n<p>Delivery of steel structure of dedusting channels of <strong>weight 104 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of cabel bridges in the plant DEZA Vala\u0161sk\u00e9 Mezi\u0159\u00ed\u010d\u00ed of <strong>weight 157 tons<\/strong><\/p>\n<p>Disassembly of roofing transitions in Chot\u011bbuz, Bartultovice, Krnov, Mosty u Jablunkova of <strong>weight 364,8 tons<\/strong><\/p>\n<p>Steel structure delivery for the business area Jord\u00e1nka in\u00a0D\u011b\u010d\u00edn of <strong>weight 120 tons<\/strong><\/p>\n<p>Delivery of steel structure of trusses for a project \u201eHypermarket\u00a0 OLYMPIA Mlad\u00e1 Boleslav\u201c of <strong>weight 167 tons<\/strong><\/p>\n<p>Steel structure delivery of <strong>weight \u00a01 560 tons<\/strong> for a companyWILLIAM HARE LIMITED<\/p>\n<p>Steel structure delivery of <strong>weight \u00a0235,2 tons<\/strong> for a company WILLIAM HARE LIMITED<\/p>\n<p>Delivery of steel structure of <strong>weight \u00a0366,1 tons<\/strong> for a company WILLIAM HARE LTD.<\/p>\n<p>Production of <strong>150 tons<\/strong> and installation of\u00a0 <strong>280 tons<\/strong> of hall steel structure for fabrication and repair of wheelset \u017dD Bohum\u00edn a.\u00a0 s.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>(RANGE 50 TONS \u2013 100 TONS) Delivery of hall steel structure for a project Bv. Trespaphan in\u00a0Neurkirchen of weight 90 tons Delivery of steel structure of Bakery Brinker in\u00a0Herne of weight 60 tons Delivery and installation of hall steel structure for a project \u201eModernizing production in\u00a0Olma a.s., plat Z\u00e1b\u0159eh na Morav\u011b\u201c \u00a0of weight 61 tons [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":5147,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"reference.php","meta":{"footnotes":""},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages\/5212"}],"collection":[{"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/comments?post=5212"}],"version-history":[{"count":7,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages\/5212\/revisions"}],"predecessor-version":[{"id":5404,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages\/5212\/revisions\/5404"}],"up":[{"embeddable":true,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages\/5147"}],"wp:attachment":[{"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/media?parent=5212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}