{"id":5171,"date":"2016-03-02T13:07:36","date_gmt":"2016-03-02T13:07:36","guid":{"rendered":"https:\/\/www.mmo-sro.cz\/?page_id=5171"},"modified":"2020-01-09T12:17:14","modified_gmt":"2020-01-09T12:17:14","slug":"year-2011","status":"publish","type":"page","link":"https:\/\/www.mmo-sro.cz\/en\/reference\/year-2011\/","title":{"rendered":"YEAR 2011-2015"},"content":{"rendered":"<p>Delivery of steel structure of pipe bridges TN3 and TN4 for a project \u201ePipe bridges Biocel Paskov a.s.\u201c incl. surface treatment.<br \/><strong>Weight: 76 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eConcrete plant Mohelnice\u201c incl. surface treatment.<br \/><strong>Weight: 97 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eConcrete plant P\u0159erov-Ohni\u0161t\u011b\u201c incl. surface treatment.<br \/><strong>Weight: 40 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eConcrete plant APB Plze\u0148\u201c incl. surface treatment.<br \/><strong>Weight: 101 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eConcrete plant Bro\u017e P\u0159erov\u201c incl. surface treatment.<br \/><strong>Weight: 98 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eHall Vamoz in\u00a0Pet\u0159vald\u201c incl. surface treatment.<br \/><strong>Weight: 277 tons<\/strong><\/p>\n<p>Production of steel structure of mouting devices for a project \u201eRotterdam \u2013 HMO\u201c incl. surface treatment.<br \/><strong>Weight: 32 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eLookout tower Vysok\u00fd Kam\u00fdk\u201c incl. surface treatment.<br \/><strong>Weight: 59 tons<\/strong><\/p>\n<p>Delivery and installation of hall steel structure for a project \u201eHall DAS\u201c incl. surface treatment.<br \/><strong>Weight: 66 tons<\/strong><\/p>\n<p>Fabrication of platforms and beam steel structure for a project \u201eNorway-Ferram\u201c incl. surface treatment.<br \/><strong>Weight: 69 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eWarehouse expansion MARLENKA\u201c incl. surface treatment.<br \/><strong>Weight: 23 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eComplex construction of steel structure for the 4th grade of secondary recovery\u201c incl. surface treatment.<br \/><strong>Weight: 253 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eVacuum furnace \u2013V\u00cdTKOVICE HEAVY MACHINERY, a.s. incl. surface treatment.<br \/><strong>Weight: 85 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of tray aggregate for a project \u201eConcrete plant Lu\u017eec nad Vltavou\u201c incl. surface treatment.<br \/><strong>Weight: 85 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of tray aggregate ZKV 400\/6K for a project \u201eConcrete plant T\u0159eb\u00ed\u010d\u201c incl. surface treatment.<br \/><strong>Weight: 69 tons<\/strong><\/p>\n<p>Steel structure fabrication for a company \u201eNBS INVEST, a.s.\u201c incl. surface treatment.<br \/><strong>Weight: 65 tons \u00a0 \u00a0<\/strong> \u00a0\u00a0<\/p>\n<p>Delivery and installation of steel structure for a project \u201eMine \u010cSA Karvina\u201c incl. surface treatment.<br \/><strong>Weight: 53 tons<\/strong><\/p>\n<p>Steel structure fabrication for a company STAMPA Ostrava spol. s.r.o. incl. surface treatment.<br \/><strong>Weight: 101 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eReconstruction steel structure of cooling chamber and outlet of ZPO3 for a company ArcelorMittal Ostava a.s.\u201c incl. surface treatment.<br \/><strong>Weight: 75 tons<\/strong><\/p>\n<p>Delivery of steel structure of sheet weldments for a project \u201eFrance \u2013 Cavallion\u201c incl. surface treatment.<br \/><strong>Weight: 56 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eConcrete plant Male\u0161ice\u201c incl. surface treatment.<br \/><strong>Weight: 41 tons<\/strong><\/p>\n<p>Delivery of steel structure for a project \u201eVD 45t Hr\u00e1dek u Rokycan\u201c incl. surface treatment.<br \/><strong>Weight: 41 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eConcrete plant Velk\u00e9 Mezi\u0159\u00ed\u010d\u00ed\u201c incl. surface treatment.<br \/><strong>Weight: 87 tons<\/strong><\/p>\n<p>Disassembly, production and installation of bridge steel structure for a project \u201ePower station D\u011btmarovice\u201c incl. surface treatment..<br \/><strong>Weight: 32 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eParking house Slan\u00fd\u201c incl. surface treatment.<br \/><strong>Weight: 54 tons<\/strong><\/p>\n<p>Delivery and installation of penthouse and stair tower steel structure for a project \u201eJCI \u017datec, 3rd Phase\u201c inlc.surface treatment.<br \/><strong>Weight: 41 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of roofing subways for a project \u201eStructual modifications of a subway SAVARIN on the street Dr. Mart\u00ednka in\u00a0Ostrava Hrab\u016fvka\u201c<br \/><strong>Weight: 22 tons<\/strong><\/p>\n<p>Disassembly, delivery and installation of bridge steel structure for a project \u201eRepair of the fourth type field of the bridge belts P70, P71\u201c \u00a0for a company ArcelorMittal Ostrava a.s. incl. surface treatment.<br \/><strong>Weight: 37 tons<\/strong><\/p>\n<p>Production of steel structure of platform beams for a company ARMATURY Group, a.s.<br \/><strong>Weight: 101 tons<\/strong><\/p>\n<p>Delivery and installation of platform steel structure for a project \u201eCasthouse exhaustion VP4 \u2013 T\u017d\u201c incl. surface treatment.<br \/><strong>Weight: 25 tons<\/strong><\/p>\n<p>Production of steel structure for a company \u201eNBS INVEST, a.s.\u201c incl. surface treatment.<br \/><strong>Weight: 176 tons \u00a0 \u00a0\u00a0<\/strong><\/p>\n<p>Production of steel structure for a company STAMPA Ostrava spol. s.r.o. incl. surface treatment.<br \/><strong>Weight: 156 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u00a0\u201eMoving the equipment for loading slag\u201c incl. surface treatment.<br \/><strong>Weight: 65 tons<\/strong><\/p>\n<p>Delivery of steel structure for a project \u201eRepair ore sorting plant &#8211; Agglomeration North\u201c for\u00a0 a company ArcelorMittal Ostrava a.s. incl. surface treatment.<br \/><strong>Weight: 144 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eSilo no.2 Calumite\u201c incl. surface treatment.<br \/><strong>Weight: 94 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eBenzole washing machine \u2013 PS 29 Benzol absorption \u00a0\u2013 OKK Koksovny\u201c incl. surface treatment.<br \/><strong>Weight: 59 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eSoundproofing and extension of the annex to the tracks K2 and K2a\u201c incl. surface treatment.<br \/><strong>Weight: 53 tons<\/strong><\/p>\n<p>Production and installation of steel structure for a project \u201eVacuum processing of steel for a company \u00a0ArcelorMittal Ostava a.s.\u201c incl. surface treatment.<br \/><strong>Weight: 225 tons\u00a0<\/strong><\/p>\n<p>Production and workshop assembly of steel structure for a company Flash Steel Power, a.s.<br \/><strong>Weight: 142 tons<\/strong><\/p>\n<p>Delivery and installation of warehouse steel structure for a company PILA CIGNA, s.r.o. incl.\u00a0 roofing by trapezodial sheets and surface treatment.<br \/><strong>Weight: 22 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eDedusting tipplers V2 and V3\u201c incl. surface treatment.<br \/><strong>Weight: 115 tons<\/strong><\/p>\n<p>Delivery and installation of extension steel structure for a project \u201eHigh School Polytechnics OLOMOUC \u2013 WORKSHOP EXTENSION \u201e incl. surface treatment.<br \/><strong>Weight: 87 tons<\/strong><\/p>\n<p>Disassembly, delivery and installation of bridge steel structure for a project \u201eRepair of the fourth type field of the bridge belts P70, P71\u201c \u00a0for a company ArcelorMittal Ostrava a.s. incl. surface treatment.<br \/><strong>Weight: 30 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eReduction of fugitive emissions from handling and cooling agglomerate &#8211; Agglomeration South in\u00a0AMO a.s. \u201c incl. surface treatment.<br \/><strong>Weight: 424 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eReduction of fugitive emissions from handling and cooling agglomerate &#8211; Agglomeration South \u2013 PS 05 \u2013 Technological steel structure\u201c incl. surface treatment.<br \/><strong>Weight: 73 tons<\/strong><\/p>\n<p>Delivery and installation of bridge steel structure for a project \u201eFeeder DN800 Ba\u0161ka \u2013 Nov\u00e9 Dvory \u2013 reconstruction of crossing of Mor\u00e1vka in\u00a0Dobr\u00e1\u201c incl. surface treatment.<br \/><strong>Weight: 89 tons<\/strong><\/p>\n<p>Production of roof steel structure for a project \u201eNILS Complex-Abuja, Nigeria\u201c incl. surface treatment.<br \/><strong>Weight: 98 tons<\/strong><\/p>\n<p>Delivery of steel structure for a project \u00a0\u201eLovochemie \u2013 Complex project of production procedures inovation\u201c incl. surface treatment.<br \/><strong>Weight: 410 tons<\/strong><\/p>\n<p>Steel structure production for a company STAMPA Ostrava spol. s.r.o. incl. surface treatment.<br \/><strong>Weight: 99 tons<\/strong><\/p>\n<p>Steel structure delivery of roof trusses for a project \u201eHydroelectric Power Station in Sudan\u201c incl. surface treatment. \u00a0 <br \/><strong>Weight: 165 tons\u00a0<\/strong> \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0\u00a0<\/p>\n<p>Delivery and installation of steel structure for a project \u201eHall steel structure Z4 and V26 \u2013 Bonatrans, Bohum\u00edn\u201c incl. surface treatment.<br \/><strong>Weight: 96 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure for a project \u201eDedusting of VP2,4 in\u00a0AMO\u201c incl. surface treatment.<br \/><strong>Weight: 39 tons<\/strong><\/p>\n<p>Delivery and installation of steel structure of collator for a company \u201eTT Brno\u201c incl. surface treatment.<br \/><strong>Weight: 70 tons<\/strong><\/p>\n<p>Delivery and installation of support steel structure for a project \u201eReduction of fugitive emissions from handling and cooling agglomerate &#8211; Agglomeration North\u201c incl. surface treatment. \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0<br \/><strong>Weight: 190 tons \u00a0<\/strong> \u00a0\u00a0<\/p>\n<p>Delivery and installation of towers steel structure for a project \u201eEmergency cooling furnaces KD and HCC\u201c for a company ArcelorMittal Ostrava a.s. incl. cladding and surface treatment.<br \/><strong>Weight: 49 tons<\/strong><\/p>\n<p>Disassembly, delivery and installation of bridge steel structure for a project \u201eRepair of the fourth type field of the bridge belts P70, P71\u201c \u00a0for a company ArcelorMittal Ostrava a.s.\u00a0 incl. surface treatment.<br \/><strong>Weight: 29 tons<\/strong><\/p>\n<p>Delivery and installation of auxiliary steel structure for a project \u201eCROMODORA WHEELS MO\u0160NOV\u201c incl. surface treatment.<br \/><strong>Weight: 39 tons<\/strong><\/p>\n<p>Delivery of steel structure for a company \u201eNBS INVEST, a.s.\u201c incl. surface treatment.<br \/><strong>Weight: 116 tons\u00a0<\/strong><\/p>\n<p>Delivery and installation of tower steel structure for a project \u201eThe greening of the power plant &#8211; Boiler K14 &#8211; tower near the chimney\u201c for a company ArcelorMittal Ostrava a.s. incl. surface treatment.<br \/><strong>Weight: 63 tons<\/strong><\/p>\n<p>Delivery and installation of pipe bridges steel structure for a project \u201ePipe bridges near Boiler K14\u201c for a company ArcelorMittal Ostrava a.s. incl. surface treatment.<br \/><strong>Weight: 162 tons<\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Delivery of steel structure of pipe bridges TN3 and TN4 for a project \u201ePipe bridges Biocel Paskov a.s.\u201c incl. surface treatment.Weight: 76 tons Delivery and installation of steel structure for a project \u201eConcrete plant Mohelnice\u201c incl. surface treatment.Weight: 97 tons Delivery and installation of steel structure for a project \u201eConcrete plant P\u0159erov-Ohni\u0161t\u011b\u201c incl. surface treatment.Weight: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":5147,"menu_order":2,"comment_status":"closed","ping_status":"closed","template":"reference.php","meta":{"footnotes":""},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages\/5171"}],"collection":[{"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/comments?post=5171"}],"version-history":[{"count":9,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages\/5171\/revisions"}],"predecessor-version":[{"id":5611,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages\/5171\/revisions\/5611"}],"up":[{"embeddable":true,"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/pages\/5147"}],"wp:attachment":[{"href":"https:\/\/www.mmo-sro.cz\/en\/wp-json\/wp\/v2\/media?parent=5171"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}