AGROSTAV a. s.

  • Erection of the steel structure of a hall "GEMI" and shelves, weight of steelwork 150 t.
  • Erection of the steel structure of a hall "GEMI B", weight of steelwork 201 t.
  • Erection of the steel structure of a hall "GEMI C", weight of steelwork 99 t.
  • Erection of steel structure for a production hall and for a seed storehouse in SEME s.r.o. Mikulov in Mušlov, weight of steelwork 127 t.
  • Erection of the steel structure including jacketing of a hall IZO in Bořetice, area 856 m2.

ALLMONT STEEL, s.r.o.

  • Supply of the steel structure of a centrifuge and a filter press building for a project "Modernisation of waste water treatment" in a company Borsod Chem MCHZ, weight of steelwork 36,3 t.

A PLUS BRNO a.s.

  • Supply and erection of the steel structure of objects for a project "Service Centre -K-, JMP a. s., Brno", weight of steelwork 321 t.
  • Supply and erection of the steel structure of an operational object F2 for a project of "Service Centre JMP a.s. Brno", weight of steelwork 320 t.
  • Supply and erection of the steel structure of an operational object E for a project of "Service Centre JMP a. s. Brno", weight of steelwork 371 t.
  • Supply and erection of the steel structure of an operational object F1 for a project of "Service Centre JMP a. s. Brno", weight of steelwork 830 t.
  • Supply and erection of the steel structure of an operational object J for a project of "Service Centre JMP a.s. Brno", weight of steelwork 110 t.

ARKON Neunkirchen – Heinitz, Germany

  • Supply of roof steel structure for a project BV.EDEKA Markt in Köllerbach, weight of steelwork 34 t.
  • Supply of hall steel structure for a project BV.Trespaphan in Neurkirchen, weight of steelwork 90 t.
  • Supply of the bakehouse steel structure of Brinker Bakery in Herne, weight of steelwork 60 t.

BAUDIN, France

  • Supply of handrail and ladder steel structure, weight of steelwork 13,2 t.

BKB Metal a.s.

  • Supply of steel structure for a casting platform for Cast House of Blast Furnace no. 4 in VPO a.s. Ostrava-Kunčice, weight of steelwork 268 t.
  • Supply and erection of gutters, North and South Cast House of Blast Furnace no. 3 in a plant ArcelorMittal Ostrava a.s., weight of steelwork 169,5 t.

BOUISSE, France

  • Supply of steel structure for a project "CINEMA – France", weight of steelwork 22,2 t.

BÖGL a KRÝSL, k.s.

  • Fabrication of single-purpose utilities, weight of steelwork 119 t.
  • Supply of steel structure for single-purpose utilities for bridge instalations, weight of steelwork 105,5 t.
  • Supply of steel structure for a bridge Třebušice, weight of steelwork 152,7 t.

CARE, France

  • Supply of steel structure for a hall SCI Logad, weight of steelwork 14 t.

CASKA INVEST a.s.

  • Supply and erection of steel structure for a project „Rebuilding of Silo into a Living House, Olomouc", weight of steelwork 37,7 t.
  • Supply and erection of hall steel structure for a project „Production Modernisation in Olma a.s., plant Zábřeh na Moravě", weight of steelwork 61 t.

Construktions Gaspaillard Plestan, France

  • Supply of hall steel structure, weight of steelwork 16 t.

DENAS COLOR a. s.

  • Fabrication and erection of steel structure for a storage hall including hall jacketing, windows and gates, weight of steelwork 51 t.
  • Supply and erection of steel structure for a canopy, weight of steelwork 18t.

DOPRAVNÍ PODNIK OSTRAVA a. s.

  • Supply and erection of steel structure for a separating wall in a tram depot in Ostrava Poruba, weight of steelwork 6 t.
  • Supply and erection of steel structure for a platform extension in a tram depot in Ostrava Poruba, weight of steelwork 8 t.

Elektromont Brno a.s.

  • Rectification of the 3-poles high voltage disconnecters in a distribution room, Coal Mine Lazy in Orlová.
  • Supply and erection of steel structure for a transformer stabilisation in a plant Tatra Kopřivnice a.s., weight of steelwork 3 t.
  • Supply and erection of steel structure for a transformer platform for a site Hyundai in Nošovice.

EXCON a.s.

  • Erection of steel structure at Power Plant Tušimice, weight of steelwork 65,8 t.

FERRAM, a.s.

  • Supply of steel structure for Mezanine-Norway, weight of steelwork 41,8 t.

Fest Bau spol. s r. o.

  • Supply and erection of lookum steel structure for dressing rooms, weight of steelwork 12t.

Gebr.Meiser GmbH

  • Fabrication of handrail and ladder steel structure, weight of steelwork 104 t.

HA.EM OSTRAVA s. r. o.

  • Erection of steel structure for Silo houses in Heating plant Olomouc, weight of steelwork 198 t.
  • Erection of steel structure for a project „Coke oven desulphurization in NH a.s.", weight of steelwork approximately 500 t.
  • Erection of a platform for a project „Dedusting of Tandem Furnace No. 4" in NH a.s., weight of steelwork 115 t.
  • Erection of steel structure of an absorber tower and other buildings for a project "Desulphurization unit in Vřesová", weight of steelwork 1062 t.
  • Supply of steel structure for a platform, weight of steelwork 16 t.
  • Supply of steel structure for SO 02 – Pipe bridge in a plant Glycona s.r.o. Otrokovice, weight of steelwork 5,8 t.

HEMAT TRADE OSTRAVA a.s.

  • Supply and erection of steel structure for a sound protection wall in Říčany-Ostrovačice, weight of steelwork 19,5 t.
  • Supply and erection of steel structure for a wine shop in Ostrava, weight of steelwork 18,2 t.

HOCHTIEF CZ a.s.

  • Supply and erection of steel structure for a Winter Stadium in Česká Třebová, weight of steelwork 92 t.
  • Supply of steel structure for a balcony handrailing in residential buildings in Farské Lúky, Čeladná, weight of steelwork 16,6 t.

Hutní montáže a.s.

  • Supply of steel structure for tuyers, the repair of Blast Furnace No. 3, VPO a.s. in Ostrava – Kunčice, weight of steelwork 45 t.
  • Supply of steel structure for a granulating storage tank in Třinec, weight of steelwork 150 t.
  • Supply of steel structure of noise protection walls for a motorway D1 158 – Věžnice, weight of steelwork 13,9 t.
  • Supply of single-purpose utilities, weight of steelwork 140 t.
  • Supply of steel structure for a site „Desulphurization of pure iron" in  TŽ a.s. Třinec, weight of steelwork 87,8 t.
  • Supply of steel structure for a site „Service centre V-KUTY" in Petřvald, weight of steelwork 218,3 t.
  • General repair of Blast Furnace no.3 in a production plant Arcelor Mittal a.s., dismounting of 332t , erection of 770 t and erection of technological equipment of 252 t of steelwork.
  • Supply of single-purpose utilities, weight of steelwork 35,9 t.

HUTNÍ PROJEKT Frýdek-Místek, a. s.

  • Supply of technological parts of construction „Coke Gas Desulphurisation in Svoboda Coke Plant in Ostrava-Přívoz". In terms of this construction, 277 tons of steel structure and 235 tons of piping networks were supplied and assembled . Further, tanks and appliances were supplied and assembled – for total contract of 1,3 million EUR.
  • Supply and installation of hall steel structure and SUNIP-panel cladding for a construction „Dispatching and Storage Hall in JAKL Karviná a.s..", weight of steelwork 130 t.
  • Installation of WTS technology in Cupola furnace building and replacement of mineral wool packing machine in ROCKWOOL, s.r.o. in Bohumín.
  • Supply and erection of steel structure for a project „Direct loading plant" in the warehouse of Rockwool Bohumín, weight of steelwork 4 t.
  • Rebuilding of MVD II warehouse in ROCKWOOL Bohumín. Supply and erection of steel structure under the belt conveyer, weight of steelwork 32 t.
  • Supply and installation of a cooling tunnel in Jihočeská drůbež, Vodňany Plant, weight of steelwork 94 t.
  • Supply and installation of steel structure for a M6 hall extension and superstructure for VZT machine room in Škoda Auto a.s. Mladá Boleslav, weight of steelwork 246 t.
  • Supply and installation of steel structure of a building 5-86 Coke Mill Building, Coke plant Svoboda in Ostrava-Přívoz, weight of steelwork 244 t.
  • Supply and installation of steel structure for a canopy in Škoda Auto a.s. Mladá Boleslav, weight of steelwork 20 t.
  • Supply and erection of steel structure for a hall „PDL II – SOO1 Steel Strip Warehouse" in JAKL Karviná a.s., weight of steelwork 377 t.
  • Supply and installation of steel structure for a construction „Slag Mill Building" in RUGBY CZ Dětmarovice, weight of steelwork 141 t incl. dismantling of 127 t of the existing steel structure.
  • Supply and istallation of steel structure incl. cladding for a new hall BLANCO CZ in Chlebovice, total weight of steelwork 160 t.
  • Supply and erection of steel structure for an amonium blower platform at Coke plant Jan Šverma in Ostrava, weight of steelwork 37 t.
  • Supply and delivery of steel structure of a partition wall in the wire works of ŽD Bohumín, total weight of steelwork 9 t.
  • Supply and delivery of piping at Coke plant Jan Šverma in Ostrava, weight of steelwork 78 t.
  • Supply and delivery of Desulfuration Cooler reconstruction at Coke plant Jan Šverma in Ostrava.
  • Supply and delivery of steel structure of the Electrical pannel room in Vítkov, total weight 3,3 t.
  • Supply and delivery of steel structure for a canopy at Coke Plant Svoboda in Ostrava, total weight 260 t.
  • Supply and delivery of steel structures of platform and pipe supporting structures for a site „Air tightening of chemical plant" at Coke Plant Svoboda in Ostrava, weight of steelwork 30 t.

Chládek a Tintěra, a.s.

  • Supply and erection of steel structure for a platform of Railway station Prague Main station, weight of steelwork 51,1 t.
  • Supply and erection of steel structure of signal bracket in Railway station Třinec, weight of steelwork 6,2 t.

Ing. Zdeněk Tomek – stavební firma

  • Supply and erection of the steel structure of a warehouse extension in Olma a.s. in Olomouc, weight of steelwork 106 t.
  • Supply and erection of steel structure at plant Wanzl Hněvotín, weight of steelwork 18,2 t.

Ingeteam, a.s.

  • Supply and erection of steel structure for Válcovny Plechu (i.e. Rolling Mill) Frýdek-Místek, weight of steelwork 65,6 t.

JÄKL Karviná a. s.

  • Supply and erection of steel structure for a crane bridge way in Pipe hall and Strip warehouse, weight of steelwork 161 t.
  • Rectification of Crane way No.75.
  • Supply and erection of steel structure for a crane bridge way in Drawing hall, weight of steelwork 109 t.
  • Repair of a crane way for cranes 4, 4A, 4B, 6 and 11 including control inspections.

KADAMO a.s.

  • Repair of technology equipment in an Agglomeration plant north in NOVÁ HUŤ Ostrava – weight of steelwork 15 t.
  • Fabrication of steel structure for P S02.
  • Erection of protection steel structure for Coke furnace No.1 in Mittal Steel a.s. Ostrava, weight of steelwork 130 t.

Leonhard Mooll Railway & Tower Systems s.r.o.

  • Supply and erection of steel structure for Tower Sokolí Hill around Děčín, weight of steelwork 34t.
  • Dismounting, supply and erection of steel structure for a radar reinstallation in Písek, weight of steelwork 20,7 t.
  • Supply and erection of steel structure for an external tower and stairs of Bílov Tower, weight of steelwork 23 t.
  • Supply and erection of steel structure for a tower stairs in Ústí nad Labem, weight of steelwork 6 t.
  • Supply and erection of steel structure for Mošnov tower, weight of steelwork 7,6 t.
  • Supply and erection of steel structure for Prague-Ruzyně radar tower, weight of steelwork 56 t.
  • Supply and erection of steel structure for Krudum tower, weight of steelwork 22,5 t.

LUCCO, a.s.

  • Erection of a Noise absorption wall at Motorway D47, weight of steelwork 9,2 t.

METACOM s. r. o.

  • Supply and erection of steel structure for I.,II. and III. stage of a project „Arc furnace No.5 noise elimination" in Vítkovice a.s. company, weight of steelwork 200 t.
  • Supply and erection of steel structure for a pot furnace in NOVÁ HUŤ a.s. Ostrava, weight of steelwork 225 t.
  • Repair of a pipe bridge over Odra river.
  • Supply and erection of a cable bridge on a site „Místecká street – Vítkovice passing road", weight of steelwork 32 t.
  • Supply and erection of a roof for the Ice ring in Bohumín, weight of steelwork 102 t.

MERKO CZ, a. s.

  • Supply and erection of steel structure for cement and stone silos, weight of steelwork 40 t.
  • Supply and erection of steel structure for silos, Concreting plant in Tovačov, weight of steelwork 12 t.
  • Supply of steel structure for Concreting plant in Trnava, weight of steelwork 8 t.
  • Supply and erection of steel structure for a stone silo 80m3, Concreting plant in Opava, weight of steelwork 15 t.
  • Supply and erection of steel structure for stone and cement silos 910m3 in Prague, weight of steelwork 106 t.
  • Supply and erection of a weighing belt, weight of 6 t.
  • Supply and erection of steel structure for cement silos at the mixing plant in Kutná Hora, weight of steelwork 41,7 t.
  • Supply and erection of steel structure for Concreting plant in Žilina, weight of steelwork 108,2 t.
  • Supply of supporting steel structure and a line silo 5 x 30m3 for Concreting plant in Košice, weight of steelwork 16,3 t.
  • Dismounting, supply and erection of steel structure for Concreting plant in Prague-Letňany, weight of steelwork 5 t.
  • Supply of space decoration steel structure for silos ZAPA Prague-Kačerov, weight of steelwork 3,8 t.
  • Supply and erection of supporting steel structure and of a stone silo for Concreting plant in Třinec, weight of steelwork 64,2t .
  • Supply and erection of steel structure for a stone silo in Concreting plant ZAPA in Ostrava-Hrabová, weight of steelwork 12,3 t.
  • Supply and erection of steel structure and of silos for CS Beton in Litoměřice, weight of steelwork 56,3 t.
  • Supply of silos for Concreting plants in Croatia, Austria and Poland with total weight of steelwork 110 t.
  • Re-building of a Production plant MERKO CZ, a.s. with weight of 175 t.
  • Supply of skip, supply and erection of steel structure and of silos for Concreting plant in Vysoké Mýto, weight of steelwork 17 t.
  • Supply of skip, supply and erection of steel structure for silos for Concreting plant in Banská Bystrica, weight of steelwork 22 t.
  • Supply of HBS50 for Concreting plant in Moravská Třebová, weight of steelwork 10 t.
  • Supply and erection of steel structure and silo in Concreting plant in Mohelnice, weight of steelwork 53 t.
  • Supply and erection of steel structure for a silo in Concreting plant in Pardubice, weight of steelwork 12 t.
  • Supply and erection of steel structure for a hall in SKANSKA, a.s., site Tovačov, weight of steelwork 31,2 t.
  • Supply of line silos for Poland, weight of 14 t.
  • Supply and erection of steel structure and of a silo in Concreting plant in Praha-Malešice, weight of 64,2 t.
  • Supply and erection of steel structure for a stone silo in Concreting plant Holcim Mělník, weight of steelwork 38,6 t.
  • Supply and erection of steel structure for Concreting plant in Praha-Malešice.
  • Supply and erection of steel structure and of a silo in Concreting plant Praha-Horoměřice, weight of steelwork 191,5 t.
  • Supply and erection of a stone silo in Concrete section production plant IP PREFA Olomouc, weight of steelworks 88,7 t.
  • Supply of steel structure for a stone silo in Concreting plant Wroclaw – Poland, weight of steelwork 8,3 t.
  • Supply and erection of steel structure and of a stone silo in Concreting plant Olbramovice, weight of steelwork 101,4 t.
  • General repair of stone handling steel structure at TBG Metrostav Praha – Rohanský ostrov.
  • Supply and erection of steel structure and of a stone silo in Concreting plant Goldbeck Prefabeton s.r.o, site Vrdy, weight of steelwork 134 t.
  • Supply of silo extensions in Concreting plant Trenčín with weight of 4,6 t.
  • Supply and erection of steel structure and of a silo in Concreting plant Ladce Beton, site Bratislava, weight of steelwork 15 t.
  • Supply and erection of steel structure for a tunnel 2A3 re-building at site Sloupárna Majdalena with weight of steelwork 39 t.
  • Supply and erection of steel structure for noise barriers in a quarry SKANSKA, a.s. site Klecany, weight of steelwork 85,5 t.
  • Supply and erection of steel structure and of a silo in Concreting plant Prefa Sučany - Slovakia, weight of steelwork 96,3 t.
  • Supply and erection of steel structure for Concreting plant TBG Metrostav, Praha-Troja, weight of steelwork 166 t.
  • Supply and erection of steel structure and of a stone silo in Concreting plant Ostrava-Přívoz, weight of steelwork 98,1 t.
  • Supply and erection of steel structure for Concreting plant in Kutno – Poland with the weight of 87 t.
  • Supply and erection of steel structure and of a silo in Concreting plant in Tovačov with the weight of steelwork 127 t.
  • Supply and erection of steel structure and of a silo in Concreting plant Goldbeck, Vrdy, weight of steelwork 143,5 t.
  • Supply and erection of steel structure and of a silo for Concreting plant Praha-Uhříněves, weight of steelwork 127,8 t.
  • Supply of steel structure for Concreting plant in Ukraine, weight of steelwork 52,9 t.
  • Supply and erection of steel structure and of a silo for Concreting plant Nové hrady, weight of steelwork 66,3 t.
  • Supply and erection of steel structure and of a silo in Concreting plant Přerov, weight of steelwork 39,2 t.
  • Supply and erection of steel structure and of asilo in Concreting plant Velké Žernoseky, weight of steelwork 104,3 t.
  • Supply and erection of steel structure and of s ilo in Concreting plant SKANSKA Štětí, weight of steelwork 78,6 t.
  • Supply of steel structure for silos 4 x 30m3 in Concreting plant HDS 1T, weight of steelwork 13 t.
  • Supply and erection of steel structure and of a silo in Concreting plant PRESSBETON Bystrovany, weight of steelwork 123,8 t.
  • Supply and erection of steel structure and of a silo in Concreting plant Žďár n. S., weight of steelwork 101 t.

Metrostav a.s.

  • Supply and erection of the steel structure of a hall in Plant depot in Horní Počernice, weight of steelwork 18 t.

Mittal Steel a.s.

  • Assembling works for a company MGT a.s. on a site "Minihuť" in Nová Huť a.s. Ostrava.
  • Erection part of steel structure for Rolling mill, for an outside crane way and for a Pot Furnace hall on a site "Minihuť" in Nová Huť a.s. Ostrava. The weight of steel erected by MORAVSKE MONTAZE Ltd. was around 1000 t.
  • Fabrication of steel structure for a defrosting plant with the weight of steelwork 39 t.

MONTÁŽE Chrudim, s.r.o.

  • Erection of steel structure on a site Hyundai, weight of steelwork 1350 t.

Moravskoslezské drůbežářské závody PROMT a. s.

  • Supply and erection of the steel structure of Cooling Tunnel hall, weight of steelwork 89 t.
  • Supply and erection of the steel structure of a hall on a site "Rebuilding of distribution centre in plant Modřice", weight of steelwork 46 t.
  • Supply and erection of the steel structure of Cutting Meat hall at plant Modřice, weight of steelwork 151 t.

MTO – ocelové konstrukce s.r.o.

  • Supply and erection of the steel structure of Tower Hradec Králové, weight of steelwork 5,1 t.
  • Supply and erection of the steel structure of Tower České Budějovice, weight of steelwork 9,4 t.
  • Supply and erection of the steel structure of Tower Větrný Jeníkov, weight of steelwork 9 t.
  • Supply and erection of the steel structure of Tower Brno-Diváky, weight of steelwork 7 t.
  • Supply and erection of the steel structure of 4 Towers Tehov, weight of steelwork 17,4 t.
  • Supply and erection of the steel structure of Tower Prašivá, weight of steelwork 8,2 t.
  • Supply and erection ofthe steel structure of Tower Liberec, weight of steelwork 7,2 t.

NBS spol. s. r. o.

  • Erection of steel structure for the roofing of railway station building in Svitavy – mass 7 t and erection of steel structure for a platform roofing – mass 98 t.
  • Erection of steel structure for Car centre with a snack bar in Karviná - Staré Město, mass 39 t.
  • Assembling and erection of steel structure for a hot water pipe rack above the river Opavica in Ostrava – Třebovice, mass 35 t.
  • Erection of steel structure on a site ČD DDC, an optimisation of railway station Bohumín, weight of steelwork 71 t.
  • Erection of the steel structure of a hall DEC PLAST Příbor.
  • Erection of the steel structure of Toll gateways, weight of steelwork 263,7 t.
  • Erection of the steel structure of a Car centre Praha-Jarov, weight of steelwork 120,2 t.
  • Erection of the steel structure of an Administration Building Hyundai in Nošovice.
  • Erection of the steel structure of the 2nd Floor Burianka in Havířov, weight of steelwork 18,4 t.
  • Supply of steel structure for a site Updating coal at ČSM coal mine, weight of steelwork 33 t.
  • Erection of steel structure at ČSM coal mine, weight of steelwork 50t .
  • Supply and erection of steel structure for the part of the pipe bridge – deviation of pipes in VÍTKOVICE, supply of 149,7 t and erection of 196,5 t.

Obchodní sladovny a. s. Prostějov

  • Supply and erection of the steel structure of Malt House Roof in Nymburk, weight of steelwork 34 t.

OKD, OKK, a.s. - Coke Plant J.Šverma in Ostrava–Mariánské Hory

  • Project „Coke gas desulphurization"
    Compressor house – supply and erection of steel structure for a hall and pipe raks, mass 150 t.
    Coke gas desulphurization – supply and erection of steel structure for platforms, pipe racks and columns, total mass 200t. Modified sulphur production – supply and erection of steel structure for platforms, columns, cable and pipe racks, mass 116t.
  • Project „Desulphurization and existing plant adaptation" - assembly of pipe and process equipment – mass 390 t and supply and erection of steel structure – mass 120 t.
  • Repair of the steel structure of the belt no. 517.
  • Disassembling and assembling of a separator Binder.
  • Repair of an inclinated ramp belt and platforms.
  • Repair of steel structure at Coke plant.
  • Repair of a bridge close to Water plant over Černý potok.

OKD, OKK, a.s. - Coke Plant J.Šverma in Ostrava–Mariánské Hory, Coke Plant Svoboda in Ostrava – Přívoz and Coke Plant ČSA in Karviná

  • Repair and maintenance of tank steel structure and technology equipment in existing plants – chemistry plant, coke screening plant and coke oven batteries. Dismantling of steel structure and process equipment.
  • Repair of pipe bridges at Plant J.Šverma.
  • Repair of steel structures for a belt transmission 2A,B at coke screening plant of Coke Plant Svoboda.

Olma a.s. Olomouc

  • Supply and erection of steel structure for shelter roofs and platforms with weight of 35 t.
  • Erection of stainless steel tanks.
  • Supply and erection of steel structure for a shelter and ramp with weight of 50 t.
  • Supply and erection of steel structure for a process building extension with weight of 14 t.
  • Supply and erection of steel structure for a pallet storage bridge.
  • Dismounting, supply and erection of steel structure and technology for Drying plant rebuilding, weight of steelwork 60 t.
  • Dismounting, supply and erection of steel structure and technology for Evaporation plant rebuilding, weight of steelwork 34 t.
  • Supply and erection of steel structure for a craneway in Plant Zábřeh na Moravě.

OSTPRA, s.r.o.

  • Supply and erection of steel structure for a storage area extension in a company Bekaert, plant Petrovice.

PECO s. r. o.

  • Supply and erection of steel structure for a ramp roofing – mass 9 t including repair of column concrete feet and roofedging in Bakery Ostrava – Martinov.

PSG – speciální stavební konstrukce, a. s. Zlín

  • Supply of steel structure for an entrance tower and for a Building 04 on a site "CENTRO Zlín", weight of steelwork 24 t.
  • Supply of steel structure for conveyor bridges on a site Barum Otrokovice, weight of steelwork 40 t.
  • Supply of steel structure for Building 101 extension on a site "Production of disc breaks in Kostelec nad Ohří", weight of steelwork 24 t.

PREMING a. s., Chrudim (VCES PRAHA a. s.)

  • Supply and erection of steel structure for halls in a project „Manufacture Plant IWK – Kysucké Nové Město" – mass 225 t.
  • Supply and erection of steel structure for a sanitary – service building „CELESTICA Ráječko – new plant" in Ráječko – mass 156 t.
  • Erection of steel structure for Olympia in Mladá Boleslav, weight of steelwork 118 t.
  • Supply and erection of steel structure for a site "RAO Olomouc", weight of steelwork 33 t.
  • Supply and erection of steel structure for a roof extension at school in Ostravice, weight of steelwork 19 t.

Průmstav Štětí a.s.

  • Supply and erection a Debarking hall in a company Assi Doman a.s.-Sepap Štětí, weight of steelwork 119 t.
  • Supply and erection of steel structure for a site R252 extension in Štětí, weight of steelwork 35 t.
  • Supply and erection of steel structure for Line 1 and 2, site "Rebuilding of Timber Yard DIII" in Štětí, weight of steelwork 8 t.
  • Supply of an anchoring and of steel elements for a site Rebuilding of Timber Yard in Štětí, weight of steelwork 19 t.
  • Supply and erection of steel structure for a site „PS 3 Reconstruction" in a plant FRENTSCHACH PULP & PAPER Czech, a. s. Štětí, weight 178 tons.
  • Supply and erection of steel structure for a site TG6 in a company Mondi a.s. Štětí, weight of steelwork 165,5 t.

První brněnská strojírna Třebíč, a. s.

  • Supply of supporting steel structure for Heating Plant Kyjov, weight of steelwork 59 t.

ROCKWOOL a.s.

  • Supplies and installations of platforms in a cupola furnace building, supply and installation of piping, installation of fans, skip carriage and tracka, dismantling of process equipment and of steel structure in cupola furnace building within Rebuilding of mineral wool production line.
  • Supply and erection of the steel structure and walls of the Raw material hall MVD II, weight of steelwork 20 t.
  • Supply and erection of steel structure for a conveyor bridge (weight of 75t) and for the roof of new central warehouse of finished products with weight of 190 t.
  • Supply and erection of steel structure and process equipment in the Cupola furnace building.
  • Supply and erection of steel structure for the roof of the loading ramp in the central warehouse of finished products with weight of 10,5 t.
  • Rebuilding of a Spinning chamber filter including the ducts – section 5 and 6.
  • Supply and erection of ducts, weight of steelworks 3,2 t.
  • Supply and erection of steel structure within the repair of the main chimney, weight of steelwork 15 t.
  • Supply and erection of steel structure for the extension of the Raw material building SO 30, weight of steelwork 55,7 t.
  • Supply and erection of steel structure (including dismounting) within the project of Rebuilding of new production line and of the cupola furnace, weight of steelwork 15 t.
  • Supply and erection of steel structure for platforms at +11,2m and openings in the floor of Cupola furnace building.
  • Modification of steel structure of Filter house 5a next to Cupola furnace building, weight of steelwork 7,8 t.
  • Supply and erection of BOH2 line extension – building SO 23, weight of steelwork 139 t.
  • Supply and erection of platform for Dustmeter, weight of steelwork 2,1 t.
  • Supply and erection of steel structure for the closing of Raw material hall, weight of 10,3 t.

Severomoravská plynárenská a. s. Ostrava

  • Supply and erection of a ramp roof incl. building and tinsmith works, weight of steelwork 6t .

SIGNUM spol. s r.o. Ocelové konstrukce

  • Fabrication of steel beams weight of 352 t for a site Hyundai Nošovice.
  • Fabrication of steel structure for a pipe bridge on a site Hyundai in Nošovice.

SIS, Francie

  • Supply of steel structure for a project GEPROMO, weight of steelwork 115,5 t.

SKANSKA CZ, a.s.

  • Supply and erection of steel structure for a school gym in Frýdek-Místek, weight of 113 t.
  • Supply and erection of steel structure for a hall extension in Praha – Uhříněves.

Slezské stavby Opava, s.r.o.

  • Supply and erection of steel structure for the roof of building BKB Metal, a.s., weight of steelwork 56,6 t.

Sokolovské strojírny, a. s.

  • Supply and erection of steel structure for conveyors to Towers A and D on Jiří coal dump in Lipnice, weight of 197 tons.
  • Supply of steel structure for an Absorber tower for Desulfuration plant Vřesová, weight of steelwork 344 t.
  • Erection of steel structure for a storage hall Mattoni in Kyselka, weight of steelwork 474 t.

SOŽ a. s. Zábřeh na Moravě

  • Supply and erection of rib steel structure of weight 112 t - for bridge construction on border crossing Rozvadov.

SP – ORMONT GROUP a. s.

  • Erection of steel structure on a site "Moving coal loading on Jiří coal dump in Lipnice" with weight of 570 t.
  • Supply and erection of a fan room on a site "Underground gas storage tanks Uhřice"
  • Erection of steel structure for Delicacy fabrication in Děčín, weight of steelwork 84 t.
  • Supply of steel structure for air ducts of Cupola furnace in ROCKWOOL a.s. in Bohumín, weight of steelwork 7,7 t.

STAMONT – POZEMNÍ STAVITELSTVÍ s.r.o.

  • Supply and erection of steel structure for a Pot tray railway, weight of steelwork 46 t.
  • Supply and erection of steel structure for an extension of Culture and sport palace in Ostrava-Vítkovice, weight of steelwork 264 t.
  • Erection of steel structure for a site "General Repair and up grading of Steelwork 1-ISSM VÍTKOVICE STEEL a.s.", weight of steelwork 456,8 t.
  • Supply and erection of steel structure for a production hall Marlenka, weight of steelwork 166 t.
  • Supply and erection of steel structure for a production hall Marlenka in Frýdek-Místek, weight of steelwork 205,4 t.
  • Supply and erection of steel structure for an ASPRO hall in Vsetín, weight of steelwork 29,4 t.
  • Supply and erection of steel structure for a service workshop in a plant EVRAZ VÍTKOVICE STEEL, a.s., weight of steelwork 20,2 t.
  • Supply and erection of steel structure for a production hall sheating at a plant OSTROJ a.s., weight of steelwork 20,3 t.

STASPO, spol. s r.o.

  • Supply and erection of steel structure for a roof and for a pipe bridge of Treating water plant (TWP) in Nový Jíčín, weight of steelwork 20,2 t.
  • Supply and erection of steel structure for TWP in Havířov, weight of steelwork 3,5 t.
  • Supply and erection of steel structure for TWP in Orlová, a site rebuilding of drainage, weight of steelwork 4,3 t.

STAVBA první stavební spol. s r. o., Havlíčkův Brod

  • Supply and erection of a Sport hall at Primary School in Přibyslav, weight of 86 t.
  • Supply and erection of the steel structure of an object roofing in District Hospital in Havlíčkův Brod, weight of 30 t.
  • Supply and erection of the steel structure of a two-bay storage hall in premises of STAZAB a. s., Prague – Malešice, weight of 41 t.
  • Supply and erection of steel structure for the roof of SPŠS School in Havlíčkův Brod, weight 104 t.
  • Supply and erection of steel structure for the reconstruction of HZS in Ledeč and Sázavou, weight 28 tons.
  • Supply and erection of steel structure for the hall of a company STAZAP a.s. Praha-Malešice, weight of steelwork 34 t.

Stavební společnost NAVRÁTIL s.r.o.

  • Supply and erection of steel structure for the roof of Centre Court in tennis centre Morava, weight of steelwork 58 t.
  • Supply and erection of steel structure for the rebuilding of bakery in Prostějov, weight of steelwork 63 t.

Stavos Stavba a. s.

  • Supply and erection of steel structure for the extension of a car park in premises of ČHÚ in Ostrava-Poruba, weight of steelwork 9,5 t.
  • Supply and erection of steel structure for the extension of Theatre A.Dvořáka in Ostrava, weight of steelwork 62 t.
  • Supply and erection of steel structure for the rebuilding of fire house in Ostrava-Fifejdy, weight of steelwork 20 t.
  • Supply and erection of steel structure for the extension roof of Regional Authority of Moravskoslezský Region in Ostrava, weight of steelwork 77 t.
  • Supply and erection of steel structure for the repair of VÍTKOVICE castle, weight of steelwork 73,2 t.
  • Dismounting of archive racks in Ostrava-Fifejdy Hospital, weight 107 t.
  • Supply and erection of fittings for repair block of flats in Havířov-Podlesí, weight 17,7 t.
  • Supply and erection of steel structure for a footbridge in Ostrava-Fifejdy Hospital, weight of steelwork 1,7 t.

STIM GmbH, Německo

  • Supply of steel structure for Universal Tower in Orlando Fun Fair, U.S.A., weight of steelwork 96,4 t.
  • Supply of steel structure for Norway, weight of steelworks 4 t.
  • Supply of steel structure for Airport Mongomeyen in Guinea, weight of steelworks 10,2 t.
  • 2 supervisors at the erection of the roof Green Point Stadium in Cape Town, South Africa.

Technomont Frýdek – Místek, s.r.o.

  • Supply of circular stairs with handrailing for a filter equipment, weight of steelwork 2 t.
  • Supply of a tank and of steel structure for a filter, weight of steelwork 19,7 t.
  • Supply of steel structure for dedusting channels, weight of steelwork 104 t.
  • Supply and erection of steel structure for cable bridges in DEZA Valašské Meziříčí, weight of steelwork 157 t.
  • Supply and erection of a stair tower with weight of 30 t.
  • Fabrication of steel structure for a turbofilter in Essen, Germany, weight of steelwork 69,2 t.
  • Supply of steel structure with weight of 75,6 t.

TEPLOTECHNA OSTRAVA a. s.

  • Supply and erection of steel structure for the construction of „Multi purpose tower Štramberk – Bílá Hora", weight of steelwork 32 t.

Úřad pro zastupování státu ve věcech majetkových

  • Dismounting of Border crossings in Chotěbuz, Bartultovice, Krnov, Mosty u Jablunkova, total weight of dismounted steel structure 364,8 t.

VAMOZ – servis s.r.o.

  • Erection of the steel structure of a bridge over Ostravica river and of a Footbridge over Ščučí stream in Ostrava-Hrabová, weight of steelwork 62,7 t.
  • Erection of steel structure in Naturprodukt OZ plant in Havířov, weight of steel 49 t.
  • Erection of steel structure for a production hall Cromodora Wheels in Mošnov, weight of steelwork 47 t.
  • Supply and erection of steel structure in ŽDB plant, weight of steelwork 22,7 t.
  • Supply and erection of steel structure for a Footbridge over Bělotínská Street in Hranice na Moravě, supply of 28,3 t and erection of 49,3 t.
  • Supply and erection of steel structure in a Service centre Phoenix Zeppelin in Ostrava-Muglinov, weight of steelwork 36,4 t.
  • Supply and erection of steel structure for Silesian Ostrava Castle with weight of 13,6 t.

VIKAM Praha, a. s.

  • Supply and erection of steel structure for a tennis hall in Praha-Vestec, weight 49 t.

Vodní stavby Bohemia, Division 3 spol. s. r. o. Temelín

  • Fabrication of jacket steel structure of mass 48 t – for Power station Chvaletice.
  • Fabrication of 21 tonnes of steel structure for AR Savings banks headquarter building, Koněvova s.r.o., Praha 3.
  • Supply and erection of steel structure for an engine room and an intermediate engine room for Heating plant Plzeň – 3rd construction stage, weight of steelwork 790 t.
  • Supply of steel structure for an advertising column including jacketting for a company ZENIT premises in Praha – Malešice, weight 2,3 t.
  • Supply of steel structure for trade premises Jordánka in Děčín, weight 120 t.
  • Supply and erection of steel structure for Cold storage plant Hollandia, Krásné Údolí, weight of steelwork 48 t.
  • Fabrication of steel structure for an Activating building and for pipe bridge in refinery Kralupy nad Vltavou, weight of steelwork 9 t.

VOKD a. s.

  • Erection of steel structure for an Ice Ring in Ostrava-Poruba, raws OA and 02 to 07 of stand, total weight 21,5 t.
  • Erection of steel structure for a Coal feeding plant Contactor house in the Coke plant Ostrava – Přívoz, weight 55 t.

VYSOKÉ PECE OSTRAVA a. s., Ostrava-Kunčice

  • Repair of steel structure on the technology equipment in Blast furnace plant, VPO a.s.
  • Change of a mixing drum at North Agglomeration.
  • Repair of the process equipment of Coke dosing into Agglomeration.
  • Repair of the process equipment of VP No.1 in the area of PS05 – Coke transport.
  • Change of a mixing drum at North Agglomeration Binder plant.
  • Repair of the process equipment of Iron ore bridge within Cast building of VP No.4.
  • Repair of steel structure at North Cast building of VP No.3.

Východočeská stavební, s. r. o. (VCES PRAHA a. s.)

  • Supply of steel beams for a site "Hypermarket OLYMPIA Mladá Boleslav", weight 167 t.

V-KUTY MEISER spol. s r.o.

  • Supply and erection of steel stairs for a Service Centre V-KUTY, weight 3,6 t.

WILLIAM HARE LIMITED

  • Supply of steel structure of the weight of 1560 t.
  • Supply of steel structure of the weight of 235,2 t.
  • Supply of steel structure of the weight of 366,1 t.

ŽD Bohumín a. s.

  • Supply and erection of steel structure of 70 t – a retaining wall in outdoor wire store area, the repair of crane runways in a pickling shop and in TPD wire rolling mill and the repair of steel structure and technology equipment according to the requirements of ŽDB a.s. head mechanical engineer.
  • Supply of 150 t and erection of 280 t of steel structure for a Production and repairing hall.
  • Fabrication of 91 t and erection of 544 t steel structure for SO 02 – Galvanizing plant for the wire producing company BEKAERT.
  • Supply and erection of steel structure on a site "Renewing wire production capacity at TPD, PJ 01.4", weight of steelwork 15 t.

ŽS Brno a.s.

  • Supply and erection of steel structure of handrailing for Railway stations Bělotín and Suchdol nad Odrou with weight of 11 t.