YEAR 2013

Delivery and installation of penthouse and stair tower steel structure for a project „JCI Žatec, 3rd Phase“ inlc.surface treatment.
Weight: 41 tons

Delivery and installation of steel structure of roofing subways for a project „Structual modifications of a subway SAVARIN on the street Dr. Martínka in Ostrava Hrabůvka“
Weight: 22 tons

Disassembly, delivery and installation of bridge steel structure for a project „Repair of the fourth type field of the bridge belts P70, P71“  for a company ArcelorMittal Ostrava a.s. incl. surface treatment.
Weight: 37 tons

Production of steel structure of platform beams for a company ARMATURY Group, a.s.
Weight: 101 tons

Delivery and installation of platform steel structure for a project „Casthouse exhaustion VP4 – TŽ“ incl. surface treatment.
Weight: 25 tons

Production of steel structure for a company „NBS INVEST, a.s.“ incl. surface treatment.
Weight: 176 tons     

Production of steel structure for a company STAMPA Ostrava spol. s.r.o. incl. surface treatment.
Weight: 156 tons

Delivery and installation of steel structure for a project  „Moving the equipment for loading slag“ incl. surface treatment.
Weight: 65 tons

Delivery of steel structure for a project „Repair ore sorting plant – Agglomeration North“ for  a company ArcelorMittal Ostrava a.s. incl. surface treatment.
Weight: 144 tons

Delivery and installation of steel structure for a project „Silo no.2 Calumite“ incl. surface treatment.
Weight: 94 tons

Delivery and installation of steel structure for a project „Benzole washing machine – PS 29 Benzol absorption  – OKK Koksovny“ incl. surface treatment.
Weight: 59 tons

Delivery and installation of steel structure for a project „Soundproofing and extension of the annex to the tracks K2 and K2a“ incl. surface treatment.
Weight: 53 tons

Production and installation of steel structure for a project „Vacuum processing of steel for a company  ArcelorMittal Ostava a.s.“ incl. surface treatment.
Weight: 225 tons